一、热轧工艺1、原料规格扁锭规格:(420~460mm)×(1000~2000mm)×(3600~6800mm)。扁锭的合金牌号:1xxx、3xxx、5xxx、8xxx等。2、设备构成扁锭铣面机1台立推式扁锭加热炉2套2400mm四辊可逆式双卷取热轧生产线1条3、工艺流程及参数⑴扁锭铣面扁锭铣面是为了去除表面的偏析瘤、夹渣、结疤和表面裂纹等,减少板片的金属及非金属压入缺陷,提高表面品质将规格为480*1500*6000的扁锭(重量11.66T),推入铣面机对扁锭的两面及两边铣面, 铣面机的运行速度0.2m/s, 需要铣掉扁锭最大厚度为6mm,一块扁锭铣掉铝屑重量383Kg,扁锭的吨铝产生的铝屑32.8kg。⑵扁锭加热
1、 Hot rolling process 1. Raw material specification: Flat ingot specification: (420-460mm) × (1000-2000mm) × (3600-6800mm). Alloy grades for flat ingots: 1xxx, 3xxx, 5xxx, 8xxx, etc. 2. Equipment composition: Flat ingot milling machine, 1 vertical push flat ingot heating furnace, 2 sets of 2400mm four roll reversible double coil hot rolling production line, 1 line. 3. Process flow and parameters: ⑴ Flat ingot milling surface. Flat ingot milling surface is used to remove surface segregation nodules, slag inclusions, scars, and surface cracks, reduce metal and non-metal pressing defects on the plate, and improve surface quality. A flat ingot with a specification of 480 * 1500 * 6000 (weight 11.66T) is pushed into the milling machine to mill the two sides and two sides of the flat ingot. The operating speed of the milling machine is 0.2m/s, and the maximum thickness of the flat ingot that needs to be milled off is 6mm. The weight of aluminum chips milled off from one flat ingot is 383Kg, and the ton of aluminum from the flat ingot is 383Kg. 32.8kg of aluminum shavings were generated Flat ingot heating
铣面合格的扁锭在立推式加热炉内进行加热,加热温度350℃~550℃,加热时间5-8小时。加热炉设有5个区,每区安装一台大流量的空气循环风机安装在炉顶,风机运行风速为10-20m/s,压缩空气消耗20m3/min;4个区共20个天然气烧嘴,分别安装在炉体上半部分的两侧,天然气约消耗1200Nm3/h。⑶热粗轧
The qualified flat ingots for milling are heated in a vertical push heating furnace at a temperature of 350 ℃ to 550 ℃ for 5-8 hours. The heating furnace has 5 zones, each zone is equipped with a large flow air circulation fan installed on the top of the furnace. The fan operates at a speed of 10-20m/s and consumes 20m3/min of compressed air; There are a total of 20 natural gas burners in 4 zones, installed on both sides of the upper half of the furnace body, with a natural gas consumption of approximately 1200Nm3/h Hot rough rolling
将加热后规格为480*1500*6000的扁锭推入四辊可逆热轧机热粗轧,最大轧制速度可达230m/s,经过5~13道次的轧制,最终将扁锭轧制到20~160mm板坯。⑷热精轧
Push the heated flat ingot with a specification of 480 * 1500 * 6000 into a four roll reversible hot rolling mill for hot roughing, with a maximum rolling speed of 230m/s. After 5-13 passes of rolling, the flat ingot is finally rolled into a 20-160mm slab Hot precision rolling
将热粗轧后的板坯在热精轧机组进行精轧操作,最大轧制速度可达480m/s,经过10-18个道次的轧制,生产出2.5~16mm厚度的板卷。
The hot rough rolled slab is subjected to precision rolling operation in the hot finishing mill, with a maximum rolling speed of 480m/s. After 10-18 passes of rolling, coils with a thickness of 2.5-16mm are produced.
二、冷轧工艺1、入口原料规格卷材厚度:2.5~15mm卷材宽度:880~2000 mm卷材直径:φ610~φ2000 mm卷材重量:12.5t2、设备构成2000mm不四辊可逆冷轧机组2套40t中间、成品退火炉6台20m中厚板精密锯切机2套MK84180×8000数控轧辊磨床2台3、工艺流程及参数⑴冷轧2-15mm的铝热轧卷在四辊不可逆冷轧机组经过3-6个道次轧至成品厚度?0.25~0.7mm。采用计算机实行平直度(AFC)、厚度(AGC)、张力(ATC)等综合自动控制进行轧制,轧制速度为5~20m/s,连轧时可达25~40m/s,压下率一般在90%~95%。⑵中间退火为消除冷轧后加工硬化现象,部分中间产品需进行中间退火作业,进行中间退火时退火温度为315~500℃,保温时间1~3h。中间退火炉用电加热,炉子顶部配备了3台大风量风机,风速为10~20m/s,加热器的总功率1080Kw,压缩空气的消耗20Nm3/h。⑶成品退火经过冷轧完成后的产品需进行退火,退火温度为260~490℃,保温时间1~5h,铝箔的冷却速度要小于15℃/h,出料温度不要高于60℃,其他厚度的轧卷出料温度不要高于100℃。
2、 Cold rolling process 1. Inlet raw material specifications: coil thickness: 2.5-15mm, coil width: 880-2000mm, coil diameter: φ 610- φ 2000 mm, coil weight: 12.5t2, equipment composition: 2000mm non four roll reversible cold rolling mill, 2 sets of 40t intermediate, 6 sets of 20m medium thick plate precision sawing and cutting machines, 2 sets of MK84180 × 8000 CNC roll grinders, 3. Process flow and parameters: (1) Cold rolling 2-15mm aluminum hot-rolled coils are rolled in 3-6 passes to the final thickness in a four roll non reversible cold rolling mill? 0.25-0.7mm. Using computers to implement comprehensive automatic control of flatness (AFC), thickness (AGC), tension (ATC), etc. for rolling, the rolling speed is 5-20m/s, and can reach 25-40m/s during continuous rolling. The reduction rate is generally between 90% and 95% In order to eliminate the work hardening phenomenon after cold rolling, some intermediate products need to undergo intermediate annealing. The annealing temperature during intermediate annealing is 315-500 ℃, and the holding time is 1-3 hours. The intermediate annealing furnace is heated by electricity, and the top of the furnace is equipped with three high wind turbines with a wind speed of 10-20m/s. The total power of the heater is 1080Kw, and the consumption of compressed air is 20Nm3/h After cold rolling, the finished product needs to be annealed at a temperature of 260-490 ℃ for 1-5 hours. The cooling rate of the aluminum foil should be less than 15 ℃/h, and the discharge temperature should not exceed 60 ℃. The discharge temperature of other thicknesses of rolled coils should not exceed 100 ℃.
三、精整工艺1、成品规格卷材厚度:0.27~0.7mm卷材宽度:880~1900 mm卷材直径:φ610~φ1800 mm卷材重量:12.5t2、设备构成2000mm横切机组(2~12mm)2套2000mm拉矫机组(0.1~2.5mm)2套2000mm横切机组(0.1~2.5mm)2套2000cm厚板矫直机组 2套2000mm卷材自动包装机组2套MK8463×6000数控轧辊磨床 ??2台3、工艺流程及参数横切生产线
3、 Finishing process 1. Finished product specifications: coil thickness: 0.27-0.7mm, coil width: 880-1900mm, coil diameter: φ 610~φ 1800mm, coil weight: 12.5t2, equipment composition: 2000mm cross cutting unit (2-12mm), 2 sets of 2000mm straightening units (0.1-2.5mm), 2 sets of 2000mm cross cutting units (0.1-2.5mm), 2 sets of 2000cm thick plate straightening units, 2 sets of 2000mm coil automatic packaging units, 2 sets of MK8463 × 6000 CNC roll grinders?? 2 units 3. Process flow and parameters for cross cutting production line
铝带横剪机组是用于对厚为2~12mm铝及铝合金卷材进行横向精确裁剪,并按产品要求整齐垛板的设备。剪切最大长度可达到11m。拉矫生产线铝卷在张力辊组施加的2.0~20 kN的张力作用下,连续通过上下交替布置的多组小直径弯曲辊,在拉伸和弯曲的联合作用下,沿长度方向产生了塑性延伸,使带材各条纵向纤维的长度趋于一致,改善带材平直度。机组运行速度可达到200m/min。厚板矫直生产线辊子的位置与被矫直制品运动方向成某种角度,两个或三个大的是主动压力辊,由电动机带动作同方向旋转,另一边的若干个小辊是从动的压力辊,它们是靠着旋转着的圆棒或管材摩擦力使之旋转的。为了达到辊子对制品所要求的压缩,这些小辊可以同时或分别向前或向后调整位置。制品被辊子咬入之后,不断地作直线或旋转运动,因而使制品承受各方面的压缩、弯曲、压扁等变形,最后达到矫直的目的。该生产线矫直力30MN。
The aluminum strip cross cutting unit is a device used for accurately cutting aluminum and aluminum alloy coils with a thickness of 2-12mm horizontally, and stacking them neatly according to product requirements. The maximum cutting length can reach 11m. Under the tension of 2.0-20 kN applied by the tension roller group, the aluminum coil in the straightening production line continuously passes through multiple sets of small diameter bending rollers arranged alternately up and down. Under the combined action of stretching and bending, plastic extension occurs along the length direction, making the length of each longitudinal fiber of the strip tend to be consistent and improving the flatness of the strip. The operating speed of the unit can reach 200m/min. The position of the rollers in the thick plate straightening production line is at a certain angle to the direction of movement of the straightened product. Two or three of the larger rollers are the active pressure rollers, which are driven by an electric motor to rotate in the same direction, while several small rollers on the other side are the passive pressure rollers, which are rotated by the frictional force of the rotating round rod or pipe material. In order to achieve the compression required by the rollers for the products, these small rollers can be adjusted forward or backward at the same time or respectively. After being bitten by the roller, the product continuously undergoes linear or rotational motion, thus subjecting the product to various forms of compression, bending, flattening, and other deformations, ultimately achieving the purpose of straightening. The straightening force of this production line is 30MN.
四、深加工工艺1、拉丝处理工艺工艺主要流程分为脱酯、沙磨机、水洗3个部分。在铝板拉丝制程中,阳极处理之后的特殊的皮膜技术,一般用直径0.1毫米的不锈钢丝刷或百洁布带刷,也可用尼龙砂带加工,可以使铝板表面生成一种含有该金属成分的皮膜层,清晰显现每一根细微丝痕,从而使金属哑光中泛出细密的发丝光泽。近年来,越来越多的铝板产品的金属外壳都使用了金属拉丝工艺 ,以起到美观,抗侵蚀的作用。2、蚀刻处理工艺先用用枣木碳研磨,去掉油腻、划痕,磨出哑光表面。然后用丝网版印上纹样,油墨型号为80-39、80-59、80-49等。印完纹样后放进电炉内烘干,然后用即时贴封住后面,用胶带封边,进入腐蚀工艺。
4、 Deep processing technology 1. The main process of wire drawing treatment technology is divided into three parts: de esterification, sand mill, and water washing. In the aluminum plate drawing process, the special coating technology after anodizing is generally achieved by using a stainless steel wire brush or scouring pad brush with a diameter of 0.1 millimeters, or by processing with a nylon sand belt. This can create a coating layer containing the metal component on the surface of the aluminum plate, clearly showing every fine wire trace, thus giving the metal matte a fine hair like luster. In recent years, an increasing number of aluminum plate products have adopted metal wire drawing technology for their metal shells, in order to achieve aesthetic and corrosion-resistant effects. 2. The etching process first uses jujube wood carbon to grind, remove grease and scratches, and grind a matte surface. Then use screen printing to print the pattern, with ink models such as 80-39, 80-59, 80-49, etc. After printing the pattern, put it in an electric furnace for drying, then seal the back with instant tape, seal the edges with adhesive tape, and enter the corrosion process.
铝板的腐蚀液配方如下:三氯化铁50% :硫酸铜50%,适量的水,温度在15~20°之间。铝板腐蚀时应平放,在腐蚀的过程中纹样上溢出赭红色的滓渣,应随时用毛刷去掉,铝面上冒出大量泡泡,滓渣随泡泡浮起。铝板的腐蚀时间大约在15~20min左右就可完成。3、电泳涂装工艺工艺流程:脱脂→热水洗→水洗→中和→水洗→阳极氧化→水洗→电解着色→热水洗→水洗→电泳→水洗→干燥。
The formula for the corrosion solution of aluminum plate is as follows: 50% ferric chloride, 50% copper sulfate, an appropriate amount of water, and a temperature between 15-20 ° C. When the aluminum plate is corroded, it should be placed flat. During the corrosion process, reddish brown slag overflows from the pattern and should be removed with a brush at any time. A large number of bubbles will appear on the aluminum surface, and the slag will float up with the bubbles. The corrosion time of aluminum plate can be completed in about 15-20 minutes. 3. Electrophoretic coating process flow: degreasing → hot water washing → water washing → neutralization → water washing → anodizing → water washing → electrolytic coloring → hot water washing → water washing → electrophoresis → water washing → drying.
在阳极氧化的基础上,通过电泳的作用,在氧化膜上均匀覆盖上一层水溶性丙烯酸漆膜,使型材表面形成阳极氧化膜和丙烯酸漆膜复合膜。铝板带进入固体份7%~9%、温度20~25℃、pH8.0~8.8、电阻率(20℃)1500~2500Ωcm、电压(DC)80~25OV、电流密度15~50 A/m2的电泳池经过1~3 min的时间电泳可涂膜7~12μm厚度。
On the basis of anodic oxidation, a water-soluble acrylic paint film is uniformly covered on the oxide film through electrophoresis, forming a composite film of anodic oxide film and acrylic paint film on the surface of the profile. Aluminum strip can be coated with a film thickness of 7-12 μ m after 1-3 minutes of electrophoresis in an electrophoresis cell with a solid content of 7% -9%, temperature of 20-25 ℃, pH of 8.0-8.8, resistivity of 1500-2500 Ω cm (20 ℃), voltage of 80-25OV (DC), and current density of 15-50 A/m2.
本文由铝板生产厂家友情奉献.更多有关的知识请点击://m.ybnettech.com/真诚的态度.为您提供为全面的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.
This article is a friendly contribution from an aluminum plate manufacturer. For more related knowledge, please click: //m.ybnettech.com/ Sincere attitude. We provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Please stay tuned